Exterior Access Staircase Handrails

Exterior Access Staircase Handrails Exterior Access Staircase Handrails – December 2025 Project Overview Bama Fabrication were once again appointed by one of our long-standing repeat clients to manufacture and install a full set of exterior handrails to a multi-level access staircase. The brief required a durable, visually clean and compliant system that would integrate with […]
Lifting Beam

Lifting Beam Lifting Beam – November 2025 Project Overview A lifting beam with a safe working load of 5000kg has recently been fabricated at our workshop in Peterborough for one of our existing clients based in the South of England. The beam will be used to support their on-site lifting operations. Scope of Works The […]
Steelwork for Mezzanine Floor

Steelwork for Mezzanine Floor Steelwork for Mezzanine Floor – October 2025 Project OverviewThis month we carried out a job for a new client who needed more space on their shop floor. The existing layout was holding them back, so the answer was to put in a mezzanine level that would make better use of the […]
Steelwork and Mesh Alteration

Steelwork and Mesh Alteration Project Overview We were appointed by a repeat client in Cambridge to carry out a small but precise alteration. The project followed the installation of a new duct that required adjustments to existing steelwork and mesh panelling. Scope of Works Our team was tasked with: Modifying the existing steel framework Altering […]
Expansion To The South West- New Saltash Office

Expansion in the South West- New Saltash Office Expansion in the South West- New Saltash Office As part of our continued growth, Bama Fabrication has opened a new regional office in Saltash, Cornwall. This strategic expansion supports our increasing workload across the South West and enhances our ability to provide responsive, high-quality fabrication services to […]
Shoreline Backing Plate Installation

SHORELINE BACKING PLATE INSTALLATION Shoreline Backing Plate Installation Project: EEAST Make Ready (Ambulance) HubLocation: IpswichDate: July 2025 Overview:Bama Fabrication was contracted to carry out the installation of a series of Shoreline Backing Plates at the new EEAST Make Ready Hub in Ipswich. The project formed part of the electrical infrastructure to support vehicle charging facilities at […]
Frame Installation

Frame Installation Frame Installation Project Date: April 2025 Project Overview The project involved the fabrication and installation of steel frames constructed from 400x15mm flat bars. Each frame measured 3 meters in height and 2.6 meters in width, with an approximate weight of 800kg. These frames were integral to the structural enhancements required on-site. Our Solution Bama Fabrication undertook […]
Maintenance Support For Babcock

Maintenance Support For Babcock Maintenance Support for Babcock – Southern UK Project Overview Bama Fabrication has been delivering ongoing maintenance and fabrication services for Babcock International across multiple sites in southern England. This long-term engagement supports Babcock’s role as a key contractor to the UK Ministry of Defence (MoD), ensuring the upkeep and enhancement of critical […]
Terrace Balustrades Installation.

Terrace Balustrades Installation. Case Study: Terrace Balustrades Installation. Client: Private Residence, UK Project Date: December 2024 Project Overview This project involved the meticulous crafting of balustrades to complement both an outdoor terrace and a set of steps, ensuring both aesthetic appeal and structural functionality. Project Scope & Execution The key objectives of this project included: Aesthetic […]
Bama Fabrication’s Steelwork Installation at Thomas Day School, London

Bama Fabrication’s Steelwork Installation at Thomas Day School, London Case Study: Bama Fabrication’s Steelwork Installation at Thomas Day School, London Client: Thomas Day School, LondonCollaborator: Quinn LondonProject Date: January 2025 Project OverviewBama Fabrication’s team worked closely with Quinn London to ensure seamless integration of the steelwork within the school’s ongoing renovation. The installation required precision engineering, meticulous planning, […]