We were appointed by a repeat client in Cambridge to carry out a small but precise alteration. The project followed the installation of a new duct that required adjustments to existing steelwork and mesh panelling.
Our team was tasked with:
Modifying the existing steel framework
Altering mesh panels to create clearance for the new duct
Ensuring the adjustments maintained both strength and functionality
The works involved adapting existing structures within a live environment, which required careful planning and accuracy. Maintaining the integrity of the steelwork while creating the necessary space for the duct was critical to the success of the job.
The alterations were completed efficiently, enabling the new duct installation to be fully accommodated without disruption. This project highlights our ability to provide responsive and reliable fabrication support, whether for large-scale builds or small, on-site modifications.








Contact us